Changes

Jump to navigation Jump to search
682 bytes added ,  18:03, 22 February 2008
no edit summary
Line 1: Line 1:  
A list of experiments in progress:
 
A list of experiments in progress:
 +
 +
'''2/29 -3/1/08 Fill-in of CW/CCW whole-body rotation while in the magnet (expt PW)'''
 +
 +
A. Muller, D.  Gonzalez, L. Carrella, J. Smith
 +
 +
n=16, 4 x CW, 4 x CCW while in magnet; 4 x CW, 4 xCCW in sham magnet
 +
 +
 +
'''2/29 -3/1/08 Very slow entry into the magnet (expt PV)'''
 +
 +
A. Muller, D.  Gonzalez, L. Carrella, J. Smith
 +
 +
n=8 at 1 cm/s(?)
 +
 +
 +
 +
'''''There is no expt PU'''''
 +
 +
 +
 +
'''2/29 -3/1/08 Test of big new arena (expt PT)'''
 +
 +
A. Muller, D.  Gonzalez, L. Carrella, J. Smith.
 +
 +
Meet at 730am on Friday. Smith, Houpt, & Carella have class/meetings at Friday at 10-11am. n= 8 rats with 30 min at 14.1 T. Label rats on head and flanks with big red and blue dots for computer visualization.
     

Navigation menu